Tumalo Reservoir Road Improvement (Bend Area) – Crews will be mobilizing equipment and doing utility work on Tumalo Reservoir Road between Johnson Road and Sisemore Road.
Traffic Information – Road users should anticipate construction vehicles and equipment entering and exiting the roadway. They should also anticipate lane closures facilitated by flaggers, with delays of up to 20 minutes during work hours, 7 a.m.-6 p.m., Monday through Friday.
Signage Improvements (Bend & Redmond Areas) – Crews will be installing sign on the following roadways:
- S Canal Boulevard
- Old Bend-Redmond Highway
- Powell Butte Highway
- O.B. Riley Road
Traffic Information – Road users should anticipate shoulder closures and intermittent lane closures facilitated by flaggers, with delays of up to 20 minutes during work hours, 7 a.m.-6 p.m., Monday through Friday.
S Century Drive/Huntington Road Intersection Improvement (La Pine Area) – No work will be occurring this week.
Traffic Information – Road users should still use caution when traveling through the work zone. The intersection is now controlled by a three-way stop, and a temporary speed limit of 25 MPH is in place near the intersection.
Projects Administered by Other Agencies
Redmond Wetlands Complex (City of Redmond) – Crews will be doing sewer utility work on NW Pershall Way, and in off-highway areas along Northwest Way and NW Coyner Avenue.
Traffic Information – Road users should expect single-lane closures facilitated by a temporary traffic signal on NW Pershall Way, with delays of up to 20 minutes during work hours.
Inquiries pertaining to this work should be directed to the City of Redmond Wetlands Complex project website.
U.S. 97: Terrebonne (Oregon Department of Transportation) – Work may be occurring on 11th Street and C Avenue.
Traffic Information – 11th Street between Smith Rock Way and C Avenue will be closed to vehicle and pedestrian traffic. Signed detour routes are in place. C Avenue remains closed to vehicle and pedestrian traffic.
Lower Bridge Way and Odem Avenue are open to allowing only right-in, right-out traffic movements. Drivers bound for U.S. 97 North will continue to use the signed detour route along NW 19th St and NW Davidson Way. The speed limit on 19th Street is temporarily set at 45 MPH.
Inquiries pertaining to this work should be directed to the project website.
China Hat Road & FS Road 1815 Closure (US Forest Service) – China Hat Road and Forest Service Road 1815 are both closed at the USFS Boundary for forest thinning work.
Traffic Information – China Hat Road and FS Road 1815 are closed to all traffic at the end of County maintenance. Access to the area is closed until further notice.
Other Road Impacts
Cascade Lakes Highway Closure – Cascade Lakes Highway from Crescent Cutoff Road to FS Road 4270, and Mt. Bachelor to FS Road 4270 will remain closed until Deschutes County Road crews can remove the snow that accumulates over the winter and early spring, typically by Memorial Day, weather permitting.
Paulina Lake Road Closure – Paulina Lake Road east of Ten Mile Sno-Park will remain closed until Deschutes County Road crews can remove the snow that accumulates over the winter and early spring, typically by Memorial Day, weather permitting.
*** Please note that work hours are subject to change based on weather conditions. ***
FOR MORE INFORMATION
Visit: deschutescounty.gov or TripCheck.com
Contact: Deschutes County Road Department at (541) 388-6581 or road@deschutesccounty.gov.